Medical Clean Room Facility

BMS design and installation for new medical clean room facility

Medical Clean Room Facility for Asgard

Medical Clean Room Facility for Asgard

CLIENT
Asgard Controlled Environments
SITE
Oxford
PROJECT
BMS installation for turnkey cleanroom project

Medical Clean Room Facility

Background: Asgard has transformed a storage warehouse into a cutting-edge research and clean room environment, where trials for new cancer curing therapies are underway.

Aim: To design and install a BMS and monitoring system to control the cleanrooms and interconnected spaces. Precise pressure, temperature and humidity control was a critical requirement, to avoid contamination and spoiling of materials.

Submit your details below in order to download the case study pdf

    BGES designed a BMS system using Trend controls IQ4 and distributed IEQeco controllers, and an IQVision top end. We undertook rigorous testing and rebalancing of the BMS to ensure it was finely tuned to maintain strict pressure regimes.

    Cleanrooms are our specialism, having delivered many new and retrofit BMS projects for these environments, as well as ongoing service and maintenance. Cleanrooms are unique spaces – and knowledge of the strict environmental conditions required is essential for a project of this type.

    The cleanroom facilities are all closely pressure, temperature and humidity controlled via the BMS, while secondary monitoring by an independent system checks the room pressures. The result is a perfect environment for world-leading cancer research. The IQVision top end gives facilities staff good visibility of faults and HVAC performance.

    What’s Next?

    We look forward to working with Asgard on future clean room projects.

    We have a great relationship with BGES, having worked with them on several turnkey clean room projects. We know we can trust them to deliver a technical solution that meets the needs of these unique environments. We welcomed their collaborative approach and detailed input on this project, from proposal stage through to commissioning.

    Ross Schofield
    Operations Manager
    Asgard Controlled Environments Ltd

    More info

    For more information about this or any project listed on our website, please Contact the BGES Group

    Telephone: 0333 015 9995

    BG House, Campbell Way
    Dinnington, Sheffield
    South Yorkshire
    S25 3QD